(Media Office)
On Wednesday evening 21st Sept. 2022 within the periodic maintenance works for marine launches at Essidre Oil Terminal, Hasnaa Launch was floated after the periodic maintenance was performed during which the problem of the rudder was fixed as well as, cradles were manufactured to be used on the sleep way in the terminal.