Beginning on today, March 5, 2020, the Engineering Department at the Sidra oil terminal in the process of establishing subsidies for the tanks of the crude oil transport line, a continuation of the targeted plan that was developed and supervised by (the management committee) to return the tanks of the crude oil center in the Sidra terminal to work and to raise the storage capacity and achieve high rates of production Enhancing its role in responding effectively and competitively to the various scenarios of energy markets and improving the schedule for delivering shipments through Sidra terminal, which has an important strategic location and the largest oil export terminals.
The Department of Engineering and Construction supervised the establishment of national bases for pipelines support (42) inches link between tanks No. 1 and 2 and 15) and these actions aim to displace line (42) and within the strategic plan to expand the storage capacity of tank No. (1) From 350,000 barrels to 500,000 barrels of crude oil.